SIMO-TEK NPI PROGRAM
Step 1: Onboarding & DFM Optimization (Days 1–3)
- Inputs: Client CAD (STEP/IGES), PCB Gerber files, BOM list.
- Actions:
﹡Executing Mutual NDA.
﹡48-Hour DFM & DFA feasibility study (wall thickness, draft angles, part consolidation, cost reduction etc.)
- Deliverable: Interactive 3D DFM Report & Quotation.
Step 2: Rapid Prototyping & POC (Weeks 1–2)
- Actions:
﹡CNC Machining / SLA/SLS 3D Printing / Vacuum Casting.
﹡Cosmetic Surface Finishing (Anodizing, Painting, Texture Matching).
﹡Functional testing for investor demos or Kickstarter/Indiegogo campaign videos.
- Deliverable:Production-Grade Functional Prototype.
Step 3: EVT / DVT / PVT Hardware Validation (Weeks 3–7)
- Actions:
﹡EVT (10–50 units): Core functional verification & PCB integration.
﹡ DVT (50–200 units): Environmental, drop, IP67 waterproof & CE/FCC compliance testing.
﹡PVT (100–1,000 units): Pilot production run to optimize line speed, assembly jigs, and yield rate.
- Deliverable:Production Sign-Off & Tooling Approval.
Step 4: Bridge Production & Global Scaling (Week 8+)
- Actions:
﹡Rapid Bridge Tooling (Soft steel/Aluminum molds).
﹡Turnkey PCBA, Injection Molding, and Box-Build Assembly.
﹡ISO 9001 Quality Inspection (IQC / IPQC / FQC).
﹡Direct Drop-shipping to Amazon FBA or Global Crowdfunding Backers.
- Deliverable:Market-Ready Finished Products Delivered Worldwide.