gary@simo-tek.com

SIMO-TEK NPI PROGRAM 


Step 1: Onboarding & DFM Optimization (Days 1–3)
- Inputs: Client CAD (STEP/IGES), PCB Gerber files, BOM list.
- Actions:
 ﹡Executing Mutual NDA.
 ﹡48-Hour DFM & DFA feasibility study (wall thickness, draft angles, part consolidation, cost reduction etc.)
- Deliverable: Interactive 3D DFM Report & Quotation.

Step 2: Rapid Prototyping & POC (Weeks 1–2)
- Actions:
 ﹡CNC Machining / SLA/SLS 3D Printing / Vacuum Casting.
 ﹡Cosmetic Surface Finishing (Anodizing, Painting, Texture Matching).
 ﹡Functional testing for investor demos or Kickstarter/Indiegogo campaign videos.
 - Deliverable:Production-Grade Functional Prototype.

Step 3: EVT / DVT / PVT Hardware Validation (Weeks 3–7)
- Actions:
 ﹡EVT (10–50 units): Core functional verification & PCB integration.
 ﹡ DVT (50–200 units): Environmental, drop, IP67 waterproof & CE/FCC compliance testing.
 ﹡PVT (100–1,000 units): Pilot production run to optimize line speed, assembly jigs, and yield rate.
- Deliverable:Production Sign-Off & Tooling Approval.

Step 4: Bridge Production & Global Scaling (Week 8+)
- Actions:
 ﹡Rapid Bridge Tooling (Soft steel/Aluminum molds).
 ﹡Turnkey PCBA, Injection Molding, and Box-Build Assembly.
 ﹡ISO 9001 Quality Inspection (IQC / IPQC / FQC).
 ﹡Direct Drop-shipping to Amazon FBA or Global Crowdfunding Backers.
- Deliverable:Market-Ready Finished Products Delivered Worldwide.


Contact Us
Add : Room 301, 6th building, No. 288 Nanyi street, Qiaodong road,
Qiaotou town, Dongguan 523520
Contact: Roger / General manager (Mr.)
Tel : 0086-769-82259510
Email: roger@simo-tek.com
Pay Attention To Us
CopyRight©SIMO-TEK INDUSTRIAL CO.,LTD. Plastic injection moulding, titanium product, carbon fiber product    Design:0086zg     Admin     Mail