Step 3: EVT / DVT / PVT Hardware Validation (Weeks 3–7)
- Actions:
﹡ EVT (10–50 units): Core functional verification & PCB integration.
﹡DVT (50–200 units): Environmental, drop, IP67 waterproof & CE/FCC compliance testing.
﹡PVT (100–1,000 units): Pilot production run to optimize line speed, assembly jigs, and yield rate.
- Deliverable:Production Sign-Off & Tooling Approval.