Step 3: EVT / DVT / PVT Hardware Validation (Weeks 3–7)

- Actions:

﹡ EVT (10–50 units): Core functional verification & PCB integration.

 ﹡DVT (50–200 units): Environmental, drop, IP67 waterproof & CE/FCC compliance testing.

 ﹡PVT (100–1,000 units): Pilot production run to optimize line speed, assembly jigs, and yield rate.

- Deliverable:Production Sign-Off & Tooling Approval.